Approval of a sample does not automatically identify every carton that can be released. The receiving team needs to know which batch and condition the approval covers.
Keep goods physically present distinct from goods approved for sale or dispatch. An approval needs a defined scope and a responsible decision owner.
Write down what the approval covers
An approval record should identify the SKU, batch, location, quantity presented, sample selected, checks performed and decision owner. Keep photographs and measured observations tied to that sample. If the merchant requested a sampling plan, record the plan it approved rather than inventing a pass rule after inspection.
Separate three statements: the sample was examined, the recorded checks met the agreed criteria, and a named person authorized a defined release. A photograph of one satisfactory item does not by itself authorize the rest of the batch. Describe the unexamined stock honestly.
Where two suppliers or pack versions are present, confirm whether one approval applies to both. If only a sublot is released, give it a distinct location or status and tell picking staff which quantities remain held.
Cost the agreed scope
For illustration, assume the merchant requests examination of 12 units at eight minutes each, plus 24 minutes for setup and reporting. With a fictional US$26 hourly labor allowance, the model is 120 ÷ 60 × $26 = $52. Increasing the sample to 20 units makes it (160 + 24) ÷ 60 × $26 = $79.73. These numbers show the effect of scope; they do not establish a statistically valid sampling plan or an inspection fee.
Direct parcels can leave only from the quantities actually released. A consolidated air or ocean lot needs a clear boundary between released and held stock before loading. Splitting an approved sublot from the rest also needs a fresh transport quote if it changes the package count or booking.
Compare the cost of an authorized split with waiting for the outstanding decision. Include additional preparation and dispatch work, but do not assign a monetary value to an unknown defect rate. The inspection record should allow a later reviewer to see exactly what was checked and exactly who accepted the remaining uncertainty.